Photovoltaic Cases
  • The PV Project of Left Banner of Khorchin, Inner Mongolia
    The PV Project of Left Banner of Khorchin, Inner Mongolia 2014-01-07

    Time: 2013 Location: Left Banner of Khorchin, Inner Mongolia The 40MW ground photovoltaic grid-connection farm project of Left Banner of Khorchin, Inner Mongolia of Guodian Solar Co., Ltd. adopted Hopewind 1.0MW integrated container photovoltaic inverter system solutions and successfully connected to the grid at the end of 2013. Hopewind inverters were running steadily on the site, with ...

    read more
  • The PV Project of Gonghe County, Qinghai
    The PV Project of Gonghe County, Qinghai 2020-01-18

    Time: 2013 Location: Photovoltaic Industry Park in Gonghe, Hainan Prefecture, Qinghai Province The 50MW grid-connected photovoltaic power project of Gonghe Tianhua New Energy adopted 80 sets of Hopewind 500kW grid-connection photovoltaic inverters. The inverters are running steadily with a high generating capacity.

    read more
  • The Roof Distribution Type PV Project of Yangzhou, Jiangsu
    The Roof Distribution Type PV Project of Yangzhou, Jiangsu 2013-12-31

    Time: 2013 Location: Yangzhou Yangzhou Zhongxu 10MW roof distribution type photovoltaic farm is located on the roof of the Industrial Park of Yangzhou, adopting Hopewind 100kW, 250kW and 630kW photovoltaic inverters and successfully connected to the grid in 2013. Hopewind inverters are running steadily, with small noise and high efficiency of transformation, and are praised by the client...

    read more
  • The Fishery-PV Project of Yangzhou, Jiangsu
    The Fishery-PV Project of Yangzhou, Jiangsu 2013-12-31

    Time: 2013 Location: Baoying, Yangzhou The 30MW fishery-photovoltaic power project adopted a photovoltaic farm constructed on the model of "fishery and photovoltaic power" within the farming pond water area of Sheyanghu Town, Baoying County, Yangzhou. The project had a total installed capacity of 30MW. It adopted 16 sets of Hopewind 1.26MW container type photovoltaic grid-connected inverters ...

    read more
  • The PV Project of Golmud, Qinghai
    The PV Project of Golmud, Qinghai 2013-12-04

    Time: 2012 Location: 12km from the southern exit of Golmud City of Qinghai Province The 50MW photovoltaic farm at Golmud of Qinghai Shenguang New Energy covers about 2.46 million square meters, with an altitude of 2900 meters. It’s rich in solar energy resources and long and steady sunshine duration. In the second half of 2012, Hopewind 500kWgrid-connection type photovoltaic inverters su...

    read more
  • The PV Project of Gonghe County, Qinghai
    The PV Project of Gonghe County, Qinghai 2013-09-02

    Time: 2013 Location: Qabqa Town, Gonghe County, Hainan Prefecture, Qinghai Province The Gonghe 20MWp grid-connected photovoltaic farm project of Qinghai Hainan Prefecture High-tech Wealth had a total installed capacity of 20MW, adopting 40 sets of Hopewind 500kW grid-connected photovoltaic inverters, which successfully connected to the grid for power generation in February 2013.

    read more
  • The PV Project of Jinchang, Gansu
    The PV Project of Jinchang, Gansu 2013-03-18

    Time: 2012 Location: Xipo, Jinchuang District, Jinchang, Gansu The 50MWp photovoltaic farm at Xipo, Jinchuan District, Jinchang, Gansu had a long sunshine duration and heavy sandstorm. Hopewind 500kW photovoltaic inverters connected to the grid for power generation successfully in the second half of 2012.

    read more
  • The PV Project of Golmud, Qinghai
    The PV Project of Golmud, Qinghai 2012-05-29

    Time: 2011 Location: Qinghai Baike Geermu Photovoltaic Power Plant The 500kW photovoltaic inverter of Hopewind Electric has successfully realized grid-connected power generation in Qinghai Baike Geermu Photovoltaic Power Plant.