  • Henan Yuzhou Shaolou Photovoltaic Power Station
    Henan Yuzhou Shaolou Photovoltaic Power Station 2016-12-23

    Time: 2016 Location: Gutian Town, Ningde City, Yuzhou, Henan Henan NWPC Yuzhou Shaolou photovoltaic project is located in Yuzhou City, Henan Province, 20km from Yuzhou City. It covers an area of 1000 acres with 200-300 meters above sea level. It locates in the warm temperate monsoon climate, abundant rainfall, adequate light, and long frost-free period. The total capacity of the PV project is 29.9...

    read more
  • Zhejiang Huaneng Huzhou Changxin Hongqiao Photovoltaic Power Station
    Zhejiang Huaneng Huzhou Changxin Hongqiao Photovoltaic Power Station 2016-10-24

    Time: 2016 Location: Gutian Town, Ningde City, Hongqiao, Zhejiang Zhejiang Huaneng Huzhou Changxin Hongqiao photovoltaic power plant is located in Chenqiao Village, Hongqiao County. The project makes full use of Huaneng Changxin Power Station’s ash bank which has a total capacity of 30MW and was not used before. 26 units of 1MW centralized-distributed inverters are used, with Hopewind centralized-...

    read more
  • Huaxia Photovoltaic Plant, Kunlun, Zibo, Shandong
    Huaxia Photovoltaic Plant, Kunlun, Zibo, Shandong 2016-10-17

    Time: 2016 Location: Kunlun Town, Shandong Province Shandong Huaxia Zibo Kunlun 20MW PV Plant is located in the hillside southwest of Kuisi Village, east of Kunlun Town, Zichuan District, Zibo City. The PV Plant is equipped with 20 sets of 1MW C&D inverter system, including 20pcs 1MW inverters and 240pcs C&D PV combiner box with 310W single crystal component. Every 1MW C&D inverter con...

    read more
  • CGN Tianyun Photovoltaic Plant, Zhongwei, Ningxia
    CGN Tianyun Photovoltaic Plant, Zhongwei, Ningxia 2016-07-13

    Time: 2016 Location: Zhongwei, Ningxia Province CGN Tianyun 130MW photovoltaic project is located in the south of Zhaobi Mountain, Zhongwei City, Ningxia Province. The location, which is away from the urban area of about 15 kilometers, covers an area of 2.73 km2 that is a typical photovoltaic mode ambient with undulating terrain and near the desert. The photovoltaic plant is equipped 55 sets ...

    read more
  • Photovoltaic Plant, Loude, Xintai, Shandong
    Photovoltaic Plant, Loude, Xintai, Shandong 2016-04-28

    Time: 2016 Location: Xintai, Shandong Province Shandong Xintai Loude photovoltaic plant is located in the mountain land east and northeast of Xiaolan village, Loude Town, Xintai City, Shandong Province, with total installed capacity of 20MW, and was grid-connected at the end of March 2016. Up to now, the system is running efficiently and stably.

    read more
  • Longji Ecological Agriculture Photovoltaic Plant, Pucheng, Shaanxi
    Longji Ecological Agriculture Photovoltaic Plant, Pucheng, Shaanxi 2016-02-29

    Time: 2015 Location: Pucheng, Shaanxi Province Shaanxi Pucheng Longji ecological agriculture photovoltaic plant is located in Liujiagou Village, Yongfeng Town, Pucheng City, Shaanxi Province. It is typical agricultural and photovoltaic agricultural ecological complementary mode. The location was equipped with 10 sets of Hopewind 1MW C&D inverter system, including 10 sets of 1MW inverters and 1...

    read more
  • 10MW Photovoltaic Plant, Longquan North, Shanxi
    10MW Photovoltaic Plant, Longquan North, Shanxi 2015-10-27

    Time: 2015 Location: Xinzhou City, Shanxi Province Shenchi Town Longquan North photovoltaic project, newly built and exclusively invested by ShanXi Aite Kechuang Wind Power Co., Ltd, uses 10 sets of Hopewind C&D MW-level integrated container system, which are equipped with 122 sets of multi-channel MPPT intelligent C&D combiner box with high reliability and low consumption. The plant was g...

    read more
  • GD Solar 30MW Grid-connected Photovoltaic Plant Phase 2
    GD Solar 30MW Grid-connected Photovoltaic Plant Phase 2 2015-04-22

    Time: 2015 Location: Qahar Right Wing Front Banner, Inner Mongolia GD Solar 30MW Grid-connected Photovoltaic Plant Phase 2, Qahar Right Wing Front Banner of Inner Mongolia, adopted 20 sets of Hopewind Centralied & Distributed Inverter solutions and successfully connected to the grid in mid-January of 2015.

    read more